Penobscot River system
In November 2003, the Court ordered a study of the mercury in the Penobscot River
Home
>
Information Repository
> Phase III Engineering Study
Phase III Engineering Study Report (September 2018)
Supporting Reports for the Phase III Engineering Study
Analytical Methods Evaluation Technical Memorandum (February 2018)
- 2016 Sediment and Water Quality Monitoring Report (September 2017)
- Text, Tables, and Figures
- Appendix A
- Appendix B-1 Part A, Part B, Part C
- Appendix B-2, Part A-1, Part A-2
- Appendix B-2, Part B-1, Part B-2, Part B-3, Part B-4
- Appendices C through E
- 2017 Sediment and Water Quality Monitoring Report (March 2018)
- 2016 Mobile Sediment Characterization Report (November 2017)
- 2017 Mobile Sediment Characterization Report (May 2018)
- 2017 Marsh Platform Characterization Technical Memorandum (May 2018)
- 2017 Intertidal & Subtidal Sediment Characterization Technical Memorandum (June 2018)
- Geochronology Core Report (September 2018)
- Hydrodynamic Model Report (May 2018)
- 2016 BSAF Technical Memorandum (September 2017)
- 2016 Biota Monitoring Report (August 2017)
- 2017 Biota Monitoring Report (August 2018)
- Risk Assessment and PRG Development Report (August 2018)
- Risk Reduction Report (September 2018)
- Communication and Community Involvement Plan (July 2018)
- Alternatives Evaluation Report (September 2018)
- Text and Tables
- Figures, Part A
- Figures, Part B
- Appendices A through J
- Appendix E, Attachment A
- Appendix E, Attachment B
- Appendix E, Attachment C, Part 1
- Appendix E, Attachment C, Part 2A
- Appendix E, Attachment C, Part 2B
- Appendix E, Attachment C, Part 2C
- Appendix E, Attachment C, Part 2D
- Appendix E, Attachment C, Part 2E
- Appendix E, Attachment C, Part 2F
- Appendix E, Attachment C, Part 2G
- Appendix E, Attachment C, Part 2H
- Appendix E, Attachment C, Part 2I
- Appendix E, Attachment C, Part 2J
- Appendix E, Attachment C, Part 2K
- Appendix E, Attachment C, Part 2L
- Appendix E, Attachment C, Part 2M
- Appendix E, Attachment C, Part 3A
- Appendix E, Attachment C, Part 3B
- Appendix E, Attachment C, Part 3C
Monthly Progress Reports
Approved Work Orders